Fremont BridgeRiver mile: 11.1 Opened: November 11, 1973 Type: steel three-span half-through tied arch, with orthotropic upper deck Main Span Length: 1,255 feet Center Height to Water: 175 feet (lower deck) Top of Arch to Water: 381 feet Color: "celery" green Cost: $82 million (including $5.5 million repair cost) Owner: Oregon Dept of Transportation Engineer/Designer: Parsons, Brinckerhoff, Quade & Douglas, New York, NY; Werner Storch and Assoc, Portland, Oregon (concept) Access: no pedestrians or bicycles Average Daily Traffic: 109,200 Historic American Engineering Record OR-104 |
|
Last updated: 18 February 2010. |