![]() |
|
Marquam BridgeRiver mile: 13.5 Opened: October 4, 1966 (lower deck); October 18, 1966 (upper deck) Type: double-deck steel through cantilever truss Main Span Length: 440 feet Center Height to Water: 165 feet (upper deck); 130 feet (lower deck) Outside Width: 57 feet (four lanes southbound; three lanes northbound) Color: concrete gray Cost: $14 million Owner: Oregon Department of Transportation Engineer/Designer: Oregon Department of Transportation Access: no pedestrians or bicycles Average Daily Traffic: 139,100 Historic American Engineering Record OR-106 |
|
Last updated: 19 February 2010. |
|